Up on the roof–that nearly wasn’t

roof

Our goal this year was to add a roof to our second floor. (See Building a dream–constructing a life) We started saving in June or so in the hopes that by the end of the year we would have the $20,000 pesos we estimated we would need. In October, Chuy, who lives up the hill above La Yacata and rents wood for construction, offered to exchange the wood we would need for the roof for our horse Beauty. No cash would exchange hands and both parties would be more than satisfied with the transaction. The deal would save us between $3,000 to $3,500 pesos. Hands were shaken, plans were made and we continued saving.

wood

Wood framing for the roof.

Chuy came for Beauty in November with the understanding that we would be ready for colando (wood frame put in place) the week prior to Christmas break. My husband made arrangements for the coladores (men who put the rebar in place and make the cement) to come on December 20 and went to request delivery of the wood. However, Chuy said he didn’t have any wood available at the moment. My husband had already purchased the sand and gravel and had the order for the cement delivery with the loan of a cement mixer, but we wouldn’t be able to use any of that if the wood framework was not already in place. There were several days of heated exchanges between my husband and Chuy. Fortunately, my husband had not given Chuy Beauty’s papers since the deal hadn’t been completed yet, so we were in a more secure bargaining position. The ultimatum was, either the wood was there on the 15th or Beauty came back to live with us. Monday morning came and there was a wood delivery–not everything we needed though. The next three days were tense as my husband and my father-in-law used each delivery of wood and requested more for the following day. Because of the piecemeal delivery, they were still working Saturday afternoon, the day the coladores came to set the rebar and el plomero from up the hill came to run the electricity tube. (We still cherish a wee bit of hope that one day we will have electricity.)

rebar

Rebar lain over the wood framing reading for the cement.

Sunday morning came and there were still some sections of wood to be put up. My son and father-in-law went up to the roof while my husband and I made a 5 am trip to Ojo de Agua en Media to fill 7 barricas (barrels) with water for the cement mix. At around 7 am, the workers began arriving on foot or by bike, quite a motley crew, ranging in age from early 20s to early 70s. They set to work making a wooden walkway from the street to the roof but ran out of nails. My husband sent me to town to the ferreteria (hardware store) to get a kilo of long nails. It being Sunday, the place that we normally go was closed. I asked the muchacha in the store across the street if she thought it would open. She said most likely since it was opened last Sunday. Since we needed the nails, I opted to stay in town in the hopes that it would open at 9. I went to the store and picked up some coke (requested by the workers), 5 kilos of tortillas, and chicarones (fried pig skin). The carniceria hadn’t received its delivery of carnitas yet, so I’d have to come back. As the ferreteria (hardware store) hadn’t opened yet, I started circling Moroleon in search of another place to buy nails. NOTHING was open! I drove around nearly 40 minutes, doing a complete circuit. On the way back to the first ferreteria (hardware store), I heard someone call my name. It was el plomero with his wife. In desperation, I blurted out the problem and asked if he had any nails at his house. He said he did and that I should follow them. I followed them to the carniceria (butcher) and the fruteria (fruit and vegetable store) and then to the place they rented a few months ago when it just became too much for them to live in La Yacata without electricity. He gave me a half-bucket of rusty nails that seemed to be the right size and I gave him 20 pesos and zoomed off.

walkway

Ramp to the roof.

My husband lunged for the bucket when I arrived and thought it would probably be enough. The workers set back to work on their walkway. In short order, it was finished and they were ready to rev up the cement mixer. It started but would shut off after a minute or two. The men ripped off the motor casing to have a look. The head guy asked for a spark plug–which we did have just lying around. He did some monkeying around and tried again. NOPE! More fiddling, and a nope! By this time is was nearly 10 am and we haven’t even started. Everyone crossed themselves for another try and…..finally it started. Then stopped after 2 minutes. This time, the gas valve wasn’t opened, which was a quick fix. Voila! The mixer started turning.

on the roof

My husband sent me to town for a garafon (container) of gas for the mixer and more trips for water. I picked up the carnitas too. When I got back, there seemed to be decidedly less gente (people) than when I left. Three guys were up on the roof with my father-in-law and husband. The boss guy had gone to town to see about getting more men, as had 4 other guys–or so they said. One of the missing did meander back with a bottle of tequila and then we realized what the problem was. We hadn’t provided alcohol for the men! DUH! Here I was thinking that the booze was for after the job was finished. Silly me. So my husband hunted up his brother B and asked him to pick up a case of beer for the guys. When the beer arrived, so did more men. Now we were rolling! After the food was eaten, I made myself scarce so that the guys could enjoy their beer, call each other guey and insult each other’s mothers while they worked.

workers

Mixing guys

It took all day but the men were happy to continue as long as the alcohol held out. When they finished, the head boss guy received the $3000 pesos agreed upon and he doled it out to the workers as he saw fit. Most of the guys really only worked for lunch, a few beers and some change. After they left, the work still wasn’t finished. My husband, son, and father-in-law filled in any cracks, tamped down the roof and swept the new cement with a broom. They finally finished just as it got dark. For the next 22 days, the wood framework stayed in place and the roof was doused twice daily with water to reduce cracking. My husband also put a row of bricks around the edge, perhaps later to develop into a half-wall. We spent close to $25,000 pesos even with the free wood rent but it really is the last major expense on our house. Everything else can be done in bits and pieces as we have the money. Whew!

finishing up

Finishing up!

********************************

disclosure

19 Comments

Filed under Construction

Failing at your own business–Freelance Essay Writing

doing homework

Last year we had the goal of putting the second story roof on our house and, therefore, needed a bit of extra money to get’er done. The unearthly hour that my son started school in the mornings meant that I arrived at my own job nearly 3 hours before my first class. Since I was there and had internet access I started sending out my resume for online jobs. To my surprise, I was offered 2 jobs almost immediately. Eagerly, I accepted both and hoped I would have enough free time.

The first position was with a company based in China that indicated that I would be assisting non-native speaking students with their English essays. As I have quite a bit of experience with ESL learners, I was excited at the prospect of revising their work. My first assignment was a “sample” assignment that would pay $60 whether or not the client accepted the completed work. The topic was on gender differences in conversation. I was to decide if there were provable differences between the sexes or not and defend my point of view. I was sent 4 pages to read with a list of additional resources to include. I went to work, although its been years since my last college essay. I submitted an outline, however, it was returned with a different outline that the client wanted me to follow. That was ok with me. I changed my focus and wrote what I felt was a passable essay, complete with references, and sent it along.

Then I was assigned another essay and this one was a doozy. Explain why President Obama continued to use drone strikes and how it violates the international humanitarian laws. As I had no idea what the current policy for drone use was, this paper required quite a bit of research. It took me the better part of a week to just get the research done. Before I even finished, I was assigned another essay, but it was a simpler topic and shorter, only 2 pages. I was to go to a public area and observe young teens in their natural habitat. But the pressure was starting to get to me. I managed to meet the deadline for the humanitarianism paper but had some issues with the formatting. I didn’t know how to send the completed essay to the right person in China, so I attached it to an email. I also asked when I would receive the payment for the first completed essay. I received a response that said they needed my Paypal information to pay me and that I needed to resend the essay in Microsoft Word because the client couldn’t open the file. So I sent the revised file and the requested information.

I didn’t have time to go to a park until Saturday afternoon. I took my son and he met a friend to play while I did my observation. Then I had to hurry back and write it up before my next class. I wasn’t quite finished with it on Saturday, so I had to come back to town on Sunday to work on it. The paper was rejected on the basis that I had spaced twice after periods instead of once. The administrator “fixed” the paper since it was dangerously close to the due date in China, it being in another time zone and all.

In the meantime, I was instructed to download the program DropBox, which I did. It’s a file sharing program. I saved my latest essay in the indicated folder, but as there were no guidelines to names, I had named it incorrectly. I was admonished that I must submit the papers appropriately or I would not longer be working for them.

I sent an email expressing my concerns about the time zone differences and mentioned that I hadn’t been paid for the sample paper yet. I was also starting to rethink this job. I had gone into it thinking I would be correcting already written papers, not writing the entire essay for the student.

I was assigned another paper. This one had a client generated outline that I was to follow. The information I received also included the course syllabus so that I could double check that I was meeting all the requirements, which I did. The topic was on the United States interference in East Asian conflicts. I wrote what was on the outline and added an additional 5 sources. I had it done a full day before it was due. I saved it correctly in the DropBox folder. I only spaced once after periods. The administrator wrote that I needed to add another 2 pages. I explained that I had included everything on the outline and added a considerable amount as well, besides which the course syllabus indicated that the paper should be 4-6 pages, not that it needed to be 6 pages. I rewrote the ending, adding a bit, but apparently, it wasn’t enough.

The next morning I received an email that I had been assigned an essay, however, it was the same essay I had completed. Then a message that the administrator had finished the essay. I checked the page where the money accumulated for finished jobs, and the money was there. Then I received another email saying that since the company had not heard from me, I would need to send my Paypal information to be paid for the work I had done. I sent the information again and minutes later I received a deposit to my Paypal account. However, it was only the total for 2 jobs, not the 4 I had done. So I tried to log back into my employee account, only to find myself denied. Guess that was their way of giving me the boot!

Well, I wasn’t going to get all bent out of shape over it. I received a little over $100 and happily spent every last cent.

**********************

disclosure

3 Comments

Filed under Employment

Failing at your own business (or not) –Saturday School

small poppins

Featured as a Creative Problem Solver at Inspired Livelihood.

Somewhere between my last teaching position and my current teaching position, I found myself unemployed. Not just unemployed, but destitute. My husband and I had separated and I rented an apartment in town for my son and myself. A decided benefit to the situation was that we now had 24-hour access to electricity, which our home in the Middle of Nowhere, Mexico was without. The downside being that now I had to pay for it. And being unemployed, I wasn’t sure what to do.

Taking advantage of the electricity, I made some English language games. I soon had requests from moms and teachers for Spanish and bible games too. But these occasional sales weren’t enough to get the bills paid.

So, I approached the owners of the school where I had hoped to work but wasn’t because the school hadn’t opened that year. I asked if they would consider allowing me to use the school on Saturdays for English classes. Generously, they said that would be fine and wouldn’t even hear of me paying them rent for the use. I went one step further in my grandiose plan and asked an art teacher if she would be interested in giving art classes on Saturdays as well. Then we started with the publicity. The school had a Facebook page and we uploaded our class offerings there. Then we went about town and posted announcements on the telephone poles and in front of schools. We also went to each of our students, present and past, and gave them the information.

So it began. I can’t say it was an instant success. We each started with 3 classes with two or three students in each class. Some days there were cancellations and we were discouraged. The art teacher began to miss classes and her students stopped coming. But I kept at it. Most Saturdays I earned a whopping $75 (which is less than $6 USD) pesos. Other days I earned upwards to $600 (about $50 USD) pesos, but those days were few and far between.

I taught whatever was asked of me. I taught classes for TOEFL exam preparation, classes for the U.S. citizenship exam, regularization classes for failing students, conversation classes for those planning on heading norte (to the U.S.), listening, reading, and grammar classes from beginner to advanced levels, kindergarten classes, adult classes and classes for every age in between. I even taught a few beginning piano classes.

mototeacher

It’s been 2 years since I began the Saturday classes and I now have classes scheduled from 8 am to 5:30 pm nearly every Saturday. I look forward to cancellations for a little down time in my day. Some of my Saturday classes have converted into weekday classes, so I now teach 2-4 classes in the afternoons Monday thru Friday. I also have an ESL teaching position from 9:20 am until 2:30 pm at the school that finally did open.

Some students have disappeared but have sent friends, relatives or classmates to me in their stead. Others have just disappeared. I’ve learned to be more selective with the classes I teach and the students I take on. I’ve actually had to say no to new students several times this year. I give preference to students that have been with me since the beginning when setting up my schedule and when cancellations occur. I have a waiting list for both the afternoon classes and Saturday classes, but the students that I have currently are not in a hurry to give up their places, for which I am incredibly grateful.

I love that I don’t teach the same old thing over and over again. Each class is more or less individual, sometimes with 2 or 3 students, and I am able to concentrate on what would be most beneficial for the student or students. The process of inventing such individualized classes has been challenging but rewarding. I enjoy seeing my students’ progress and watching them master tricky language skills. I am who they recommend when an English expertise is needed. Although I won’t ever become wealthy teaching on such a small scale, I have become rich in experience and it does get the bills paid.

*************************************

ForTeachersOnly.com

Shop now 

disclosure

14 Comments

Filed under Education, Employment, Teaching