Puppers on Parade

Drastic actions needed to be taken with our dogs and we took them, sort of. First, everyone got collars. Fred and George Puppers were not happy but did ok with them. Puppy was so depressed with his collar that my husband took it off when he got home from work. We let the Puppers get used to the collars a few days before implementing any other changes. Puppy wouldn’t let us put the collar back on.

Then we got some leashes. My son started leash training individually. Fred did great. He went around the block without even a moan on the leash. George fussed at the leash but did get up and down the road a few times with some encouragement. Puppy, well, Puppy went into hysterics. Not only did my son have to put the collar back on, but Puppy was SURE he was being dragged to his death and acted accordingly. 

Over the next few days, Fred, the star student and George, the C student, resigned themselves to leash walking. Puppy wouldn’t even try and threw a FIT every time we made the attempt to put the collar back on. 

IMG_20191008_131524 (2)

The next step was to hook the leashes up. I had ordered both a double leash for the Puppers and a separate leash for Puppy because I knew he wouldn’t want to share. The Puppers got a bit tangled the first time out, but overall enjoyed the experience. Puppy, collarless and leashless, went on the walk with us as well, as delighted as could be. He led the parade proudly, making sure each bush was safe for us to pass. He stayed with us the entire walk without any behavior incidents even when a motorcycle passed. 

We also needed to deal with the Puppers behavior when they were outside. Every time some jerk came and threw rocks at them, there was a scandal. So we thought the best thing for all concerned would be to curtail their outside time. They could not stay on the animal side of the house however because they howled during my online classes. 

 

IMG_20191008_131620 (2)So my son set up a doggy daycare system. Before he goes to work in the mornings, he takes everyone for a walk. After the walk, the Puppers are turned loose into his aunt’s backyard. There is some shade to relax under, bugs to chase, grass to chew on and cool water. There’s even some company when my husband is working inside the house. Right now he’s working on patching the walls and ceilings. Meanwhile, Puppy hangs out in the front of the house in the cool sand pile. 

When my son gets home from work, he goes to “pick up” the Puppers and they go for another walk, get a snack and some fresh water. There are 2-3 more walks before the end of the day when everyone is herded into the animal side for the night. 

Behavior issues have lessened, even with Puppy who is a free-range dog still. It seems he feels less threatened by everything with the Puppers leashed. His position as leader of the pack is firmly established by his collarless neck. 

However, people who kick at Puppy from their motorcycles or chuck rocks at him continue to totally make him go ballistic, so not everything is fixed just yet.

1 Comment

Filed under Animal Husbandry

And moving on to the bathroom…..

Last Thursday, the carpenter and his helper were scheduled to deliver the corner shelf we had commissioned for the bathroom. On Wednesday, he called to ask whether I wanted clear or pebbled amber glass for the doors. The colored glass of course. Okie Dokie then, they’d be there sometime on Thursday.

So since they weren’t there first thing in the morning, I gave them a call to see when they would arrive. The tentative time was about 6 pm that afternoon. Ok, well, that’s a little late and of course since we use solar energy, if the installation required a lot of power, this could be an issue. 

Actually, it was nearly 8 pm when they arrived. Despite our power concerns, they were able to get the installation done in less than an hour. Apparently, the vidriería (glass shop) where they get their glass was closed and that held them up. 

You can see in this picture that the door is a lighter brown than the corner cabinet.

The one issue that did come up, is the color. Despite having the entire kitchen done by them in a specific wood color, the corner shelf was considerably darker when it arrived. As my husband set this project up, I wasn’t privy to what color he specified but he didn’t seem too happy about it. 

Even though it doesn’t match the door or towel holder or anything in the kitchen, it does match the curtain rod we moved from the kitchen to the bathroom, so I am fine with it. It extends from floor to ceiling and unlike the kitchen cupboards, I can reach all but the topmost shelf, which makes me happy. 

It’s too tall to get a fill picture no matter where I stood. This is the upper half.

So my husband paid and the carpenters left. A few minutes later, I got a call saying that we had OVERPAID by $200 pesos and that we could pick the money up at the carpintería on Monday, which we did. Now how often does that happen in Mexico? 

That’s the final project we have scheduled for awhile. We need to change the bathroom sink faucet out since the one that’s there now leaks, but that’s a small thing overall. 

As far as I’m concerned, the inside of the house is completely finished. Now on to the outside!

2 Comments

Filed under Construction, Uncategorized

Doors and Windows

The same ferretería guy who did the zaguán and front window was in charge of the back door and back window at my sister-in-law T’s house. It was a full two weeks before any progress was made. 

He went twice during that time to the tortillería to ask for more money to finish the job. My husband told his sister that she was not to give him any more money until the job was finished. More than half of the total price had already been paid, which was more than enough for the material needed. So she didn’t.

Of course, that just delayed things even longer. Every time my husband went to see what day to expect them for installation, it was always “mañana.”(tomorrow). Well, mañana is a long time coming here in Mexico. 

IMG_20190924_145048 (2).jpg

They did finally arrive, the one day my husband couldn’t be here. So my son was in charge of supervision. The door was installed. As you can see from the picture, it’s quite a bit smaller than the frame and will need to be cemented in place.  

IMG_20190924_145100 (2).jpg

Back yard view.

The window fit a little better, but the sliding track is bent or something. It is hard to open and close it. 

And the guy had the gall to say that T owed him yet another 500 pesos on top of the balance still owed. T paid up. He offered to do the bathroom window as well. T said that his work was disappointing and that he wouldn’t get any more work nor recommendations from her. My husband was a little less diplomatic with his thoughts on the workmanship when he saw him.

So the bathroom window, the handle for the zaguán, and the aluminum trim that holds the glass in place will be done by another ferretería (metalworking shop). Meanwhile, my husband is going to add some cement and rebar in order to fix the fitting of the back door.

1 Comment

Filed under Construction, Uncategorized