The same ferretería guy who did the zaguán and front window was in charge of the back door and back window at my sister-in-law T’s house. It was a full two weeks before any progress was made.
He went twice during that time to the tortillería to ask for more money to finish the job. My husband told his sister that she was not to give him any more money until the job was finished. More than half of the total price had already been paid, which was more than enough for the material needed. So she didn’t.
Of course, that just delayed things even longer. Every time my husband went to see what day to expect them for installation, it was always “mañana.”(tomorrow). Well, mañana is a long time coming here in Mexico.
They did finally arrive, the one day my husband couldn’t be here. So my son was in charge of supervision. The door was installed. As you can see from the picture, it’s quite a bit smaller than the frame and will need to be cemented in place.

Back yard view.
The window fit a little better, but the sliding track is bent or something. It is hard to open and close it.
And the guy had the gall to say that T owed him yet another 500 pesos on top of the balance still owed. T paid up. He offered to do the bathroom window as well. T said that his work was disappointing and that he wouldn’t get any more work nor recommendations from her. My husband was a little less diplomatic with his thoughts on the workmanship when he saw him.
So the bathroom window, the handle for the zaguán, and the aluminum trim that holds the glass in place will be done by another ferretería (metalworking shop). Meanwhile, my husband is going to add some cement and rebar in order to fix the fitting of the back door.