Building Project Update

Things have been slow going on the little building project we began some months ago. Partly do to the exorbitant rise in the price of building materials. The latest truckload of bricks literally cost twice what the same amount did two months ago. Rebar and cement have also nearly tripled in price. I’d blame it on the backup of shipping containers in the port in LA, but I know for a fact that the bricks are made locally and the rebar and cement have been sitting in the ferretería (building supplies/hardware store) for several months, so who knows why things are so high all of a sudden.

We’ve fleshed out our plan for the lot finally. The single room and bathroom downstairs will be built so that it can easily be converted to a family restaurant or tiendita (store) in the future. So it has an open plan, counters, and a bathroom. The second floor will also be open, but (at least in my mind) will be my writing/class teaching office. Lots of natural light, good airflow, and a view of the gardens, unlike the dark hole I teach from now. 

We also are toying with the idea of setting up a home gym. We’ve been collecting exercise equipment bit by bit. Right now we have a stationary bike and a pull-down bar, plus 3 sets of hand weights. My husband made a 20-pound barbell with cement and coffee cans, so we have that too. It’s a little beyond my current lifting abilities, but my son uses it daily.  

Anyway, once the second floor is finished, one part would be my writing office and another part would be a home gym. Unfortunately, at the current material prices, it looks like we will not get as much accomplished this year as I had hoped. 

Brick by brick, my fellow citizens, brick by brick.– attributed to Emperor Hadrian

1 Comment

Filed under Construction

One response to “Building Project Update

  1. Pingback: End of Year 2021 Recap | Surviving Mexico

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.